• Over 6 years of experience in multi-billion dollar Oil & Gas, Metals & Mining, and Power EPC projects
• Demonstrated expertise in international, multicultural, collaborative team environments
• Successfully worked towards achievement of ISO 9001 and LRQA certifications
• Adaptability to rapid changes in fast paced, high pressured situations.
• Technical degree complemented by International MBA attained in Europe
Project Engineer @ Worked as Project Engineer in the Engineering unit executing USD 5.7 million CAPEX projects for the DUBAL’s facility in Jebel Ali. Catered to the refurbishment and upgradation of the following areas:
• Power and Desalination
• Potlines
• Casthouse
• General Plant wide Facilities
Responsibilities:
• Developed project objectives, plans, specifications, and cost estimates for Refurbishment of Demineralisation Plant and Chemical Storage Areas to reduce the maintenance activities by 20% in the associated 2350 MW Power Station and Sea Water Desalination plant.
• Used expertise in structural design and STAAD to produce a 25% saving in cost of civil works for Upgradation of Plant wide AC units.
• Utilised expertise in STAAD and AutoCAD to produce design concepts and to review and optimise designs submitted by contractors.
• Successfully completed the technical studies through research and data gathering for Installation of New Hydrogen Fluoride Monitoring System in Potrooms; prepared cost and time estimates using parametric estimation.
• Maintained project schedule and quality by monitoring project progress, coordinating activities, and resolving problems by evaluating constructability of design, sharing lessons learnt , and conducting frequent site visits.
• Lead Kickoff meeting, facilitated coordination between area owner and contractor to achieve successful initiation of project execution phase for Dubal’s Coastal Protection Project.
• Enforced HSE procedures, rules, and regulations, ensuring zero loss time injury in all my project sites. From March 2015 to August 2015 (6 months) MBA Student @ From September 2013 to July 2014 (11 months) Engineer @ • Utilized my expertise in STAAD to complete the deliverables in Onshore Pipe Rack area, and various process structures in Isodewaxing area within budget and on schedule.
• Utilized FEM analysis to achieve economical designs for process structure and equipment foundations.
• Conducted inter-discipline and inter-office coordination through telephone and video conferences to ensure error free deliverables.
• Reviewed 3D models using SPR and Microstation to ensure adherence to safety, utility and quality guidelines; attending model reviews and resolving client’s comments using SPR and SPR3D.
• Contributed to mid-project quantities review using parametric as well as bottom up estimation. From December 2010 to July 2013 (2 years 8 months) Gurgaon, IndiaDeputy Manager @ • Utilized my expertise in STAAD and AutoCAD to successfully complete design deliverables within budgeted quantities and on schedule for various structures in Pellet plant, Beneficiation plant, and Raw Material Handling System for the ISP.
• Used my skills in Excel and AutoCAD to produce standardized design spreadsheets and drawings thereby ensuring successful completion of Vale Pelletization Plant project.
• Prepared quantity estimates using various estimation techniques towards preparations of bids for thermal power plant projects.
• Reviewed scope change requests for the impact on schedules and estimated revised quantities.
• Conducted inter-discipline and inter-office coordination through meetings and teleconferences to ensure error free deliverables. From October 2009 to November 2010 (1 year 2 months) Surat Area, IndiaAssistant Manager @ • Utilized my expertise in STAAD and AutoCAD to successfully complete design deliverables within budgeted quantities and on schedule for various structures in Beneficiation plant, and Raw Material Handling System for the ISP.
• Used my skills in Excel and AutoCAD to produce standardized design spreadsheets and drawings thereby ensuring successful completion of Vale Pelletization Plant project.
• Developed checklists to standardize checking of design calculations and fabrication drawings thereby increasing efficiency and minimising errors.
• Conducted inter-discipline and inter-office coordination through meetings and teleconferences to ensure error free deliverables. From December 2007 to October 2009 (1 year 11 months) Graduate Engineer @ • Utilized my expertise in STAAD and AutoCAD to successfully complete design deliverables within budgeted quantities and on schedule for various structures in Raw Material Handling System for the ISP.
• Conducted inter-discipline and inter-office coordination through meetings and teleconferences to ensure error free deliverables. From June 2007 to December 2007 (7 months)
Master of Business Administration (MBA) @ Central European University From 2013 to 2014 B.Tech, Civil Engineering @ Visvesvaraya National Institute of Technology From 2003 to 2007 Hari Subedi is skilled in: Engineering, Construction, Project Management, Management, Team Management, Microsoft Office, Structural Engineering, Steel, STAAD, AutoCAD, Project Planning, Financial Accounting, Operations Management, Sustainability, Financial Modeling