|
|
|
51-200 employees
View all
|
|
construction
|
|
The contract, with a value of about QAR 7.5 billion, covers design and construction of a dual-tube underground line with a length of 13.8 kilometers between the Doha airport and the Msheireb neighborhood in the historic center of the Qatari capital.Average depth of 25 meters below ground level utilizing five tunnel boring machines. The maximum depth point will approximately reach 50 m below ground level.
|
Doha Metro Red Line South Joint Venture Project Email Formats | Example Email Formats | Percentage |
---|---|---|
{first}.{last} | [email protected] |
92.86%
|
The widely used Doha Metro Red Line South Joint Venture Project email format is {first}.{last} (e.g. [email protected]) with 92.86% adoption across the company.
To contact Doha Metro Red Line South Joint Venture Project customer service number in your country click here to find.
Find accurate personal emails, work emails and phone numbers for employees
Accelerate prospecting with instant access to 300M professionals from 30M companies with the right contact details.