|
|
|
51-200 employees
View all
|
|
Civil Engineering
|
|
Level 3, 140 Sussex St.,, Sydney, NSW 2000, AU
|
|
John Holland CPB Contractors Ghella (JHCPBG) - Sydney Metro TSE Works | 19,669 followers on LinkedIn. $2.81 Billion Sydney Metro Tunnelling contract | John Holland CPB Ghella (JHCPBG) has been contracted to design and construct the Tunnel and Station Excavation Works for Sydney Metro City and Southwest.
The works include:
- Twin 15.5-kilometre metro rail tunnels from Chatswood to Marrickville, including under Sydney Harbour and the CBD
- Excavation and civil works for six new metro stations at Crows Nest, Victoria Cross, Barangaroo, Martin Place, Pitt Street and Waterloo
- Construction of two dive sites at Chatswood and Marrickville and a rail crossover cavern at Barangaroo
- Excavation of a temporary shaft at Blues Point to retrieve tunnel boring machines and a substation shaft at Artarmon to provide power for future train operations
- Precast facility at Marrickville to produce the concrete tunnel-lining segments.
Sydney Metro is Australia’s largest public transport project.
|
John Holland CPB Contractors Ghella (JHCPBG) - Sydney Metro TSE Works Email Formats | Example Email Formats | Percentage |
---|---|---|
{f}{last} | [email protected] |
75.00%
|
The widely used John Holland CPB Contractors Ghella (JHCPBG) - Sydney Metro TSE Works email format is {f}{last} (e.g. [email protected]) with 75.00% adoption across the company.
To contact John Holland CPB Contractors Ghella (JHCPBG) - Sydney Metro TSE Works customer service number in your country click here to find.
Find accurate personal emails, work emails and phone numbers for employees
Accelerate prospecting with instant access to 300M professionals from 30M companies with the right contact details.