Architectural BIM Technician at Chapman Taylor
Preston, United Kingdom
Fuse Studios Limited
Architectural BIM Technician
October 2015 to Present
Manchester, United Kingdom
ArchiTechnical Solutions Ltd
Director
January 2015 to Present
Leach Rhodes Walker Ltd
Senior Architectural Technician
December 2014 to October 2015
Croft Goode Architects
Senior Architectural Technician
February 2011 to December 2014
Brookson (5392D) Ltd
Director
May 2000 to September 2014
Gilling Dod Architects
Architectural Technician (contract)
2008 to February 2011
AFL Architects
Architectural Technician (contract)
2007 to 2008
Manchester, United Kingdom
Gilling Dod Architects
Architectural Technician (contract)
2006 to 2007
Leach Rhodes Walker Ltd
Architectural Technician (contract)
2003 to 2006
Manchester, United Kingdom
Aedas
Architectural Technician (contract)
2003 to 2003
Manchester, United Kingdom
Broadway Malyan
Architectural Technician (contract)
2002 to 2003
Manchester, United Kingdom
FAIRHURSTS DESIGN GROUP
Architectural Technician (contract)
2002 to 2002
Manchester, United Kingdom
What company does Neil Dunn work for?
Neil Dunn works for Fuse Studios Limited
What is Neil Dunn's role at Fuse Studios Limited?
Neil Dunn is Architectural BIM Technician
What industry does Neil Dunn work in?
Neil Dunn works in the Architecture & Planning industry.
📖 Summary
Architectural BIM Technician @ From October 2015 to Present (3 months) Manchester, United KingdomDirector @ Architectural services/support (Technical) From January 2015 to Present (1 year) Senior Architectural Technician @ Hotels - New build, London & Blackpool (Revit/BIM) Residential - New build, Salford (Revit/BIM) From December 2014 to October 2015 (11 months) Senior Architectural Technician @ Production of construction information for various Housing Association residential schemes. Job runner for: New build Housing Association apartments. Refurbishment/rebuilding of a Grade 2 listed residential property in Liverpool Refurbishment/remodelling of existing nursery. BIM (Revit) Technician From February 2011 to December 2014 (3 years 11 months) Director @ Provide Architectural Services From May 2000 to September 2014 (14 years 5 months) Architectural Technician (contract) @ Job runner for a new build Low Secure/Step Down mental health unit and Step Down Cottages in Preston. Build cost £6 million. Job runner for a new build Low Secure mental health unit in Preston. Build cost £10 million. Constructed on ahead of schedule and under budget Technical support for £75 million new build hospital scheme at Whitehaven From 2008 to February 2011 (3 years) Architectural Technician (contract) @ Part of a small technical team, which was responsible the production of information, specifications and drawings, for a number of healthcare schemes in Manchester From 2007 to 2008 (1 year) Manchester, United KingdomArchitectural Technician (contract) @ Technical support for the architects, with responsibility for the production of information, specifications and drawings on mental health facilities, medium secure and one high secure. From 2006 to 2007 (1 year) Architectural Technician (contract) @ Job runner for a new build city centre apartment scheme in the centre of Manchester, as part of a small team, responsible for the production and coordination of the technical drawings and construction information, technical queries, site visits and meetings. Job runner for a new build leisure facility in Congresbury, Bristol, responsible for the production and coordination of the technical drawings and construction information, technical queries, site visits and meetings. From 2003 to 2006 (3 years) Manchester, United KingdomArchitectural Technician (contract) @ Part of a small technical team, responsible for the production of information, specifications and drawings, for a new build inner city commercial/residential scheme in central Manchester. From 2003 to 2003 (less than a year) Manchester, United KingdomArchitectural Technician (contract) @ Part the team, which was responsible the production and coordination of the technical drawings and construction information for a city centre apartment scheme in the centre of Manchester. Involved in the production of the tender package for the for the Millennium Village Community at Allerton Bywater From 2002 to 2003 (1 year) Manchester, United KingdomArchitectural Technician (contract) @ Part the team, which was responsible the production and coordination of the technical drawings and information for a two stage tender package, for a speculative office building in the centre of Manchester From 2002 to 2002 (less than a year) Manchester, United Kingdom Neil Dunn is skilled in: BIM, Revit, Feasibility Studies, AutoCAD, CAD, Construction Drawings, Design Management, 3D, Architectures, SketchUp, Specifications, Job Running, CAD Standards
Introversion (I), Sensing (S), Thinking (T), Perceiving (P)
2 year(s), 7 month(s)
Unlikely
Likely
There's 92% chance that Neil Dunn is seeking for new opportunities
Enjoy unlimited access and discover candidates outside of LinkedIn
Trusted by 400K users from
76% of Fortune 500 companies
The most accurate data ever
Hire Anyone, Anywhere
with ContactOut today
Making remote or global hires? We can help.
No credit card required