Plant Manager at Adient
Auburn, Alabama Area
Adient
Plant Manager
Auburn, Alabama Area
Better Bilt Aluminum
Extrusion Superintendent
July 1994 to July 1995
Pelahatchie, MS
Faurecia
Plant Manager
March 2017 to July 2019
Greater Memphis Area
voestalpine Nortrak Inc
Plant Manager
July 2015 to March 2017
Birmingham, Alabama Area
Puckett Machinery Company
Service Manager
March 2014 to July 2015
Flowood, MS
Kohler Co.
Superintendent Manufacturing
June 2011 to March 2014
Hattiesburg, Mississippi
Kohler Co.
Production Manager - Machining
June 2009 to June 2011
Hattiesburg, MS
Kohler Co.
Production Manager - Assembly
March 2003 to June 2009
Hattiesburg, MS
Kohler Co.
Production Manager
April 2000 to March 2003
Hattiesburg, MS
Kohler Co.
Supervisor - Production Planning
February 1998 to April 2000
Hattiesburg, MS
SourceLink
Lettershop Manager
July 1995 to February 1998
Madison, MS
Caradon Doors & Windows
Production Supervisor / Manager
February 1993 to July 1994
Pelahatchie, MS
University of South Carolina - The Moore School of Business
Certificate of Management
2000 to 2000
University of Southern Mississippi
BSBA - Production & Operations Management, Industiral Engineering and Business Management
1990 to 1992
Center For Creative Leadership
Leadership Development Certificate, Leadership
2016 to 2016
Jones County Junior College
Business
1988 to 1990
University of Michigan - Stephen M. Ross School of Business
Management II Certificate
2003 to 2003
What company does Hankins Drew work for?
Hankins Drew works for Adient
What is Hankins Drew's role at Adient?
Hankins Drew is Plant Manager
What industry does Hankins Drew work in?
Hankins Drew works in the Automotive industry.
Who are Hankins Drew's colleagues?
Hankins Drew's colleagues are Mark Haertel, Manel Carbó Pallarés, Agustin Baixauli Benlloch, Carlos Rovira, Vicente Mallent Bertolín, Hélène Weitmann, Franck Sarazin, Daria Biryukova, Yannick MACE, and Amine Fekhar
📖 Summary
Plant Manager @ Adient Auburn, Alabama AreaExtrusion Superintendent @ Better Bilt Aluminum Managed installation of aluminum extrusion equipment and electrostatic paint line. Supervised the extrusion and paint operations in support of 11 different aluminum window and door assembly lines. Also provided extensive safety and forklift training for this support operation which included 30 factory associates, 4 maintenance technicians, 2 Foremen and 2 Die Repairmen. Responsible for maintaining process control within design specifications while improving raw material yields. From July 1994 to July 1995 (1 year 1 month) Pelahatchie, MSPlant Manager @ Faurecia Responsible for leading a 3-shift Laser Welding & Assembly plant as well as a remote Service Production Center providing metal automotive seat frames to 11 different Tier 1 JIT locations in the US. These plants are staffed with up to 320 factory associates. Directly responsible for HR, Safety, Production, Production Planning, Accounting, Quality, Maintenance, and Manufacturing Engineering. Directly responsible for Plant P&L on annual revenue exceeding $125 million Communication with customers to ensure expectations are exceededManaging Faurecia Excellence System (TPS) to achieve YOY improvements Improvements achieved (2017-2018 VS 2016)36% EBIT increase from 5.5% to 7.5% on same YOY Sales40% reduction in OSHA Recordable incidents76% COPQ improvement - 1.5% to .35% of Net Sales17.5% improvement of MPM (OTD) – 85% to 99.9%21.8% Productivity improvement – 78% to 95% of standardFreight optimization & Packaging annual savings - $1 millManufacturing Supplies & Tooling annual savings - $312KCapital Improvements yielding annual savings of $900K with 1.1% ROIGM Supplier Quality Award 2017 / Ford Q1 Status 2018 From March 2017 to July 2019 (2 years 5 months) Greater Memphis AreaPlant Manager @ voestalpine Nortrak Inc Responsible for leading a 4-shift Machining and 2-shift Assembly plant as well as a 2-shift remote Plant in Irondale, AL. These plants are staffed with up to 180 factory associates. Directly responsible for HR, Safety, Production, Production Planning, Purchasing, Accounting, Quality, Maintenance, and Manufacturing Engineering.Duties in this continuous improvement role include: Directly responsible for Plant P&L on annual revenue exceeding $60 million Communication with customers to ensure expectations are exceededLEAN Implementation to help achieve YOY improvements in On-Time-Delivery, utilization, profitability, and qualityManagement of Capital projects to ensure targeted ROI of less than 24 monthsImprovements achieved (2015-2016 VS 2014) 100% reduction in OSHA Recordable incidents to zero48% EBIT increase from 8% to 11.9%15% Productivity improvement 36% COPQ improvement from .5% to .32% of Net Sales16% improvement of On-Time-Delivery From July 2015 to March 2017 (1 year 9 months) Birmingham, Alabama AreaService Manager @ Puckett Machinery Company Responsible for leading service and repair operations for a Caterpillar heavy equipment dealer. This dealer service organization is staffed with 102 CAT certified technicians, 3 Service Managers, 3 Service Coordinators, 6 Product Support Sales Reps, and 2 administrative support personnel.Duties in this continuous improvement role include: Directly responsible for service operations P&L on annual revenue exceeding $20 million Daily communication with customers to ensure expectations are exceededUtilize LEAN tools and principles to achieve YOY improvements in utilization, profitability, and qualityManagement of Capital projects to ensure targeted ROI of less than 18 monthsImprovements achieved (2014 VS 2013) 50% reduction in OSHA Recordable incidents45% Flat Rate Variance improvement 18% customer defect / rework rate reduction290% profitability improvement on 4.61% less sales than in 2013 From March 2014 to July 2015 (1 year 5 months) Flowood, MSSuperintendent Manufacturing @ Kohler Co. Responsible for leading a 3-shift Machining operation and 2-shift Assembly plant consisting of 11 different cast iron / aluminum work cells & 2 high-volume assembly lines. These areas are staffed with up to 510 factory associates and 7 Production Supervisors. Reporting dotted-line to me were 5 Manufacturing Engineers, 3 Quality Engineers, 3 Material Schedulers, 2 Maintenance Supervisors, and 5 Quality Technicians. Duties in this continuous improvement role include: Directly responsible for the plant operations P&L on annual revenue exceeding $125 million Prepare annual financial plan using marketing forecast models Communicate with vendors, customers, and sales to assure customer expectations are exceeded Manage up to 85% of the variable costs input to this plant Utilize LEAN manufacturing tools to achieve YOY improvements in productivity, capacity, and quality Implemented TPM (Total Productive Maintenance) program Management of Capital projects to ensure targeted ROI Implementing & managing annual cost reductions equal to 2.5% of Net SalesImprovements achieved (2011-2014) 51% reduction in lost time incidents22% productivity increase 52% customer defect rate reduction30% plant capacity increase From June 2011 to March 2014 (2 years 10 months) Hattiesburg, MississippiProduction Manager - Machining @ Kohler Co. Responsible for leading a 3-shift Machining operation consisting of 11 different cast iron / aluminum work cells These areas are staffed with up to 220 factory associates, 4 Production Supervisors, 1 Material Scheduler, 1 Electrical Engineer, and 2 Maintenance Foremen. Reporting dotted-line to me are 3 Manufacturing Engineers and 2 Quality Technicians. Duties in these continuous improvement roles include: Tracking, reporting and making course corrections to key metrics in safety, quality, schedule, & cost Preparing annual department financial plan using marketing forecast models and capacity models Communicating with vendors, customers, and sales to assure customer expectations are exceeded Managing up to 50% of the variable costs input to this plant Implementing LEAN and utilizing the tools to achieve YOY improvementsEnsuring process control within Quality System parameters Implementing improvements & managing annual cost reductions exceeding 10% of total expenses Implemented 5-S Workplace Organization Program From June 2009 to June 2011 (2 years 1 month) Hattiesburg, MSProduction Manager - Assembly @ Kohler Co. Responsible for leading a 2-shift Assembly operation consisting of 2 high-volume assembly lines. These areas are staffed with up to 225 factory associates, 2 Production Supervisors, 2 Material Schedulers, 1 Electrical Engineer, and 2 Maintenance Foremen. Reporting dotted-line to me are 2 Manufacturing Engineers and 2 Quality Technicians. Duties in these continuous improvement roles include: Tracking, reporting and making course corrections to key metrics in safety, quality, schedule, & cost Preparing annual department financial plan using marketing forecast models and capacity models Communicating with vendors, customers, and sales to assure customer expectations are exceeded Managing up to 50% of the variable costs input to this plant Implementing LEAN and utilizing the tools to achieve YOY improvementsEnsuring process control within Quality System parameters Implementing improvements & managing annual cost reductions exceeding 10% of total expenses Implemented 5-S Workplace Organization Program From March 2003 to June 2009 (6 years 4 months) Hattiesburg, MSProduction Manager @ Kohler Co. Responsible for leading a 3-shift Machining operation / 2-shift Assembly operation consisting of 8 different cast iron / aluminum work cells / 1 high-volume assembly line. These areas are staffed with up to 350 factory associates, 5 Production Supervisors, 2 Material Schedulers, 1 Electrical Engineer, and 2 Maintenance Foremen. Reporting dotted-line to me are 4 Manufacturing Engineers and 3 Quality Technicians. Duties in these continuous improvement roles include: Tracking, reporting and making course corrections to key metrics in safety, quality, schedule, & cost Preparing annual department financial plan using marketing forecast models and capacity models Communicating with vendors, customers, and sales to assure customer expectations are exceeded Managing up to 80% of the variable costs input to this plant Implementing LEAN and utilizing the tools to achieve YOY improvementsEnsuring process control within Quality System parameters Implementing improvements & managing annual cost reductions exceeding 10% of total expenses Implemented 5-S Workplace Organization Program From April 2000 to March 2003 (3 years) Hattiesburg, MSSupervisor - Production Planning @ Kohler Co. Responsible for supervision of 4 production-planning areas that provide direct logistics support for a two-shift machining and engine assembly process. Department staffed with 12 factory associates and 6 administrative associates. Duties in this role consisted of: MRP scheduling functions providing components to assembly and raw casting materials for machining. Communicating with vendors as well as customers to formulate production plans and delivery schedules Controlling annual inventory value of over $216 million that is turned 24 times per year Directing plant logistics including traffic scheduling, receiving and shipment of finished products Training associates in the operation of material handling equipment and SAP inventory system Implementing Kan Ban Stores, Vendor Managed Inventory Programs and Visual Pull Systems From February 1998 to April 2000 (2 years 3 months) Hattiesburg, MSLettershop Manager @ SourceLink Responsible for the operation of 6 letter-shop departments that included 55 factory associates and 7 Production Supervisors overseeing a two-shift operation Duties in this role consisted of: Scheduling equipment for daily production on Folders, Inserters, Labelers, and Sorters Maintaining postal documentation per US Postal regulations Managing productivity improvements through process changes and Capital additions Ensuring on time delivery of finished goods for proper shipments Managing capital investments to ensure targeted ROI Directing all shipping and receiving activities From July 1995 to February 1998 (2 years 8 months) Madison, MSProduction Supervisor / Manager @ Caradon Doors & Windows Responsible for the safe operation of 8 window assembly departments with 68 factory associates and 4 Production Foremen. Duties included scheduling optimum production runs, recruiting, interviewing and staffing, reducing raw materials inventory, reducing scrap, improving productivity, and providing finished products for on-time delivery to customers. Also performed time studies in start-up departments determining production standards and line balancing. From February 1993 to July 1994 (1 year 6 months) Pelahatchie, MS
Extraversion (E), Intuition (N), Feeling (F), Judging (J)
2 year(s), 5 month(s)
Unlikely
Likely
There's 86% chance that Hankins Drew is seeking for new opportunities
Enjoy unlimited access and discover candidates outside of LinkedIn
Trusted by 400K users from
76% of Fortune 500 companies
The most accurate data ever
Hire Anyone, Anywhere
with ContactOut today
Making remote or global hires? We can help.
No credit card required
Hankins Drew's Social Media Links
/company/a...