Superintendent at PCL Construction
Greater Los Angeles Area
PCL Construction
Superintendent
Greater Los Angeles Area
PCL Construction
Superintendent
June 2016 to July 2016
Greater Los Angeles Area
PCL Construction
Superintendent
January 2014 to October 2015
Greater Los Angeles Area
PCL Construction
Superintendent
October 2014 to March 2015
Greater Los Angeles Area
PCL Construction
Assistant Superintendent
October 2013 to August 2014
Greater Los Angeles Area
PCL Construction
Assistant Superintendent
October 2013 to March 2014
Greater Los Angeles Area
PCL Construction
Assistant Superintendent
October 2013 to January 2014
Greater Los Angeles Area
PCL Construction
Project Engineer
August 2011 to October 2013
Greater Los Angeles Area
PCL Construction
Field Engineer
June 2007 to January 2010
Greater Los Angeles Area
UCLA WASSERMAN FOOTBALL CENTER, LOS ANGELES, CALIFORNIASUPERINTENDENT $57,000,000 EST. COMPLETION 2017The Wasserman Football Center is a multi-level structure located at the west end of Spaulding Field. Highlights of the new building include a grand entryway with prominent displays and tribute space honoring UCLA Football student athletes, strength and conditioning rooms, locker rooms, players’ lounge, recruiting... UCLA WASSERMAN FOOTBALL CENTER, LOS ANGELES, CALIFORNIASUPERINTENDENT $57,000,000 EST. COMPLETION 2017The Wasserman Football Center is a multi-level structure located at the west end of Spaulding Field. Highlights of the new building include a grand entryway with prominent displays and tribute space honoring UCLA Football student athletes, strength and conditioning rooms, locker rooms, players’ lounge, recruiting lounge and outdoor terrace, new equipment room, coaches’ offices, and team meeting rooms.
📖 Summary
Superintendent @ PCL Construction UCLA WASSERMAN FOOTBALL CENTER, LOS ANGELES, CALIFORNIASUPERINTENDENT $57,000,000 EST. COMPLETION 2017The Wasserman Football Center is a multi-level structure located at the west end of Spaulding Field. Highlights of the new building include a grand entryway with prominent displays and tribute space honoring UCLA Football student athletes, strength and conditioning rooms, locker rooms, players’ lounge, recruiting lounge and outdoor terrace, new equipment room, coaches’ offices, and team meeting rooms. Greater Los Angeles AreaSuperintendent @ PCL Construction UCLA FRANZ HALL SEISMIC IMPROVEMENT, LOS ANGELES, CALIFORNIASUPERINTENDENT $124,804 COMPLETED 2016The Franz Hall Seismic improvement project consisted of two interior mock-ups constructed at 2/3 scale of the existing columns and deck to seismically test. This information was then analyzed to determine the necessary structural upgrades on an existing UCLA structure for design. From June 2016 to July 2016 (2 months) Greater Los Angeles AreaSuperintendent @ PCL Construction UNIVERSAL PROJECT 384 WIZARDING WORK OF HARRY POTTER – UNIVERSAL CITY, CALIFORNIASUPERINTENDENT $182,630,554 COMPLETED 2015PCL provided preconstruction and construction services for the Wizarding World of Harry Potter at Universal Studios in Hollywood, California. The project began with the demolition of an amphitheater, multiple auxiliary theme-park buildings, and restaurants at Universal Studios Hollywood. The completed project includes the Forbidden Journey ride, Hogwarts Castle pre-show and queue, Hogsmeade land retail and restaurant buildings, the Flight of the Hippogriff rollercoaster, all associated area development hardscape and landscape, and a themed food-service building. From January 2014 to October 2015 (1 year 10 months) Greater Los Angeles AreaSuperintendent @ PCL Construction UNIVERSAL PROJECT 947 SHREK Q – UNIVERSAL CITY, CALIFORNIASUPERINTENDENT $4,434,198 COMPLETED 2015Demolition and re-installation of the shade structure and themed ride queue while maintaining access to the operating ride by performing multiple barricade adjustments. From October 2014 to March 2015 (6 months) Greater Los Angeles AreaAssistant Superintendent @ PCL Construction UNIVERSAL STUDIOS RESTROOM RELOCATION – UNIVERSAL CITY, CALIFORNIAASSISTANT SUPERINTENDENT $2,541,031 COMPLETED 2014Relocation of existing theme park restroom to allow for future park improvements. From October 2013 to August 2014 (11 months) Greater Los Angeles AreaAssistant Superintendent @ PCL Construction UNIVERSAL STUDIOS TELECOMMUNICATION ROOM – UNIVERSAL CITY, CALIFORNIAASSISTANT SUPERINTENDENT $697,730 COMPLETED 2013This design-build project consists of a new telecommunications building which will be used to upgrade the existing Telecom infrastructure for the Universal Studios Hollywood City Walk area. From October 2013 to March 2014 (6 months) Greater Los Angeles AreaAssistant Superintendent @ PCL Construction UNIVERSAL STUDIOS TRASH ENCLOSURE – UNIVERSAL CITY, CALIFORNIAASSISTANT SUPERINTENDENT $530,011 COMPLETED 2013Design-Build project consisting of construction of a new trash enclosure area where all Universal Studios Theme park and City Walk debris can be collected and managed. From October 2013 to January 2014 (4 months) Greater Los Angeles AreaProject Engineer @ PCL Construction UCLA PAULEY PAVILION RENOVATION AND EXPANSION, LOS ANGELES, CALIFORNIAPROJECT ENGINEER $101,903,504 COMPLETED 2013The UCLA Pauley Pavilion scope of work includes the renovation of the existing facility and expansion of the building including revisions to the seating, life safety systems, restrooms, concessions, entrances, fan amenities, athletic facilities, and a new interior concourse encircling the entire arena. Additional work included practice basketball court, enhanced locker rooms, premium seating and new entry concourse. 56,944 GSF of new space was added and 180,000 GSF of remodeled space, a total area of 236,944 GSF. The project achieved LEED Gold certification. From August 2011 to October 2013 (2 years 3 months) Greater Los Angeles AreaField Engineer @ PCL Construction UCLA TERASAKI LIFE SCIENCES BUILDING, LOS ANGELES, CALIFORNIAFIELD ENGINEER $129,379,569 COMPLETED 2010The UCLA Terasaki Life Sciences Building consists of two wings with wet and dry laboratories, offices, scholarly activity space, and building support spaces on five floors plus a basement vivarium. The 175,000 GSF structure is supported by a cast-in-place concrete frame with flat-slab floor decks. This building is the new home of the Biological Sciences Department. Divisions within the department include Molecular Studies; Cell and Developmental Biology; Physiological Science; and Biology, Ecology and Evolution. This lab building attained LEED Silver certification. From June 2007 to January 2010 (2 years 8 months) Greater Los Angeles Area
What company does Allen Hill work for?
Allen Hill works for PCL Construction
What is Allen Hill's role at PCL Construction?
Allen Hill is Superintendent
What industry does Allen Hill work in?
Allen Hill works in the Construction industry.
Who are Allen Hill's colleagues?
Allen Hill's colleagues are Mark Mourey, Chris Stack, Chris Ritter, Aryan Rahimzadeh, Thomas Neary, Patrick Malone, Kelli Kelly, Daniel Brown, John Jensvold, and Andrew Hatch
Extraversion (E), Intuition (N), Feeling (F), Judging (J)
1 year(s), 1 month(s)
Unlikely
Likely
There's 95% chance that Allen Hill is seeking for new opportunities
Enjoy unlimited access and discover candidates outside of LinkedIn
One billion email addresses and counting
Everything you need to engage with more prospects.
ContactOut is used by
76% of Fortune 500 companies
Allen Hill's Social Media Links
/company/p... /school/pu... /redir/red...